
Luxury duplex apartment just 500 meters from the sea in the highly sought-after Rovinj!
We are proud to present a new development currently in the ROH-BAU phase of construction, consisting of 6 residential units with 2 apartments on each floor. This high-quality building is located just 500 meters from beautiful beaches, crystal-clear waters, and well-maintained walking paths with a bicycle route through nature and parks. This project offers the rare opportunity to own a property in one of the most desirable and upscale locations in Rovinj, surrounded by family homes and modern buildings, only a 3-minute drive from the city center. The building’s location is perfect for those seeking an investment opportunity in luxury tourism or anyone looking for a private oasis of peace and tranquility in the enchanting city of Rovinj.
APARTMENT DESCRIPTION: These spacious and comfortable apartments each span 159 m² and include parking spaces. The layout is thoughtfully designed, with a corridor at the entrance that separates the private areas of the apartment from the living and entertainment spaces. The living area is designed as an open-plan space, featuring a large kitchen, a comfortable dining room, and a spacious living room with access through a glass wall to a covered terrace with a jacuzzi. The private section of the apartment includes two bedrooms and two bathrooms. An internal staircase leads to the second floor, where you’ll find a cozy living room with access to a terrace offering stunning panoramic views. The second part of the apartment includes a spacious bedroom and bathroom, along with an additional room intended as a playroom.
ADDITIONAL AND TECHNICAL INFORMATION:
- The apartment is sold as a turnkey unit, without furniture.
- The price includes underfloor heating throughout the apartment.
- Each room will be equipped with air conditioning.
- High-quality carpentry with electric blinds is being installed.
- The building has an elevator, connecting all floors, including the basement.
- Only verified, high-quality materials are used in construction.
- The completion of the project and the possibility of moving in is planned before the start of the summer season in 2025.